Active Pipeline

Projects under development.

Three communities currently moving through entitlement, construction, and design — each sited around the terrain rather than against it.

Ridgeline Residences rendering Rendering
Entitlement

Ridgeline Residences

Green Circle · Turnkey

24 low-density homesites along the eastern ridge, sited for direct lift access and protected treeline setbacks. Designed as the turnkey entry point into the community — fully finished homes, no build-out required.

24Homesites
2026Est. Delivery
Ski-InLift Access
Direct lift access Protected sightlines Low-density siting
Street-level rendering Aerial site plan rendering
Basecamp Village Phase 1, delivered Phase 1 — Delivered
Phase 2 Under Construction

Basecamp Village

Blue Square · Move-In Ready

The mixed-use village core — retail ground floor, residences above, and a dedicated employee housing block built in partnership with the resort operator. Phase 1 residences are delivered and occupied; Phase 2's retail and housing block is in active construction.

40Residences
2027Ph. 2 Delivery
MixedUse Type
Ground-floor retail Employee housing block Village core siting
Basecamp Village rendering Phase 1 delivered, aerial Phase 2 foundation under construction
Northface Cabins under construction Under Construction
Under Construction

Northface Cabins

Black Diamond · Full Custom

12 timber-frame cabins along a groomed backcountry corridor — the most remote and fully custom offering in the portfolio, designed for off-grid capability without sacrificing finish quality. First cabin now framing.

12Cabins
2028Est. Delivery
Off-GridCapable
Backcountry corridor Timber-frame construction Off-grid capable
Northface Cabins rendering First cabin framing, on site
Slope-side hotel concept rendering Concept Rendering
Concept — Not Yet Announced

Slope-Side Hotel

Future Phase · Hospitality

An early architectural concept for a full-service, ski-in/ski-out hotel anchoring a future phase of the portfolio. Site selection and resort partnership terms are still in progress — this is direction, not a committed project yet.

TBDKeys
TBDTimeline
ConceptStatus

A note on this page

Renderings and site photography above are updated as each project moves — Phase 1 delivery photos and construction progress shots replace early concept renderings as work completes. The Slope-Side Hotel is an early concept only; no site or timeline has been committed.

Where we build.